:: Beautiful Day ::

Wednesday, September 07, 2005

Passing Day...

Phew~!Feeling tired and sleepy at this time now..Yesterday me and few team of colleague was assigned to go to Johor for training in the Flextronic in Tebrau branches for the new tester. We depart from the company at around 1030am and reach Johor at 3pm. We went to check in in New York Hotel. After that, we went to the company and the engineer started to explain about the new tester for us. It start with the CSA(customer satisfaction Autorization) and later on..we went to the CSA office to see the CSA working station and so on. This is what we have done on the first day. At night, we went to Red Box and one of our team didn't join us because he was too tired after driving for few hours and stuck with jam.

The second day, we started our journey at around 815am and reach Flextronic at around 845am. Today..which mean the 2nd day of our journey, we couldnt get the Engineer to teach us. So we went to the production line and watch how the tester being build into one printer which will be send to the end user (HP customer). It was a good journey as we saw many small component being build and intergrated into one portion and this is how it become a tester.Now i know that Tebrau's Flextronic is deal with the building of the tester to end user. The tester that we use in Malacca in the RMA(Return Material Autorization) dept is to test the BCBA board which return from the Top Level in Tampoi. Malacca flextronic is deal with the building the BCBA board from the production line and then send to the Tampoi,Johor, to verified and if there is any damage or reject. Then it will return to Malacca again to RMA dept to debug and test again. My job function is to make sure all the tester is going well and in good condition. If one or two of the tester is not functioning well, then me and my team will need to troubleshoot and find the defect in the tester as well as the program running. So we need to understand how the tester is being build from the plain to a complete tester because sometimes we need to change the sensor hidden inside the tester. T10 & T8 is our accompany during our troubleshooting. Other team will use the tester to test the return BCBA board using the Program that we install an so on. Well..I think i am quite clear with my job function already. hehe..

Tired to the maximum but later on need to revise back what i have done in Johor to send back the information to my team. When there is free time, i will upload those picture i took from Johor. I will continue writing my blog in the future time.